The file has to have calculations for the number of employees, cost needed for the office and office layout drawing. it can be hand drawing but has to include numbers to be professional. The pdf should have all information that you need but the shifts for employees should be THREE shifts per day. The report is for the rest of the parts that is required. You can look up to it to see how the calculation should permeate into this report.
Facilities Design (Office Layout)
June 9th, 2021
You can leave a response, or trackback from your own site.