CSU Consultants Contract
21982 University Lane | Orange Beach, AL 36561
Question | Response | ||||
Project Background | (What has the client hired you to do? What basic information do you have on the project?) | Description of the project | |||
Scope of Work | A detailed description of the work 1 2 3 4 5 6 7 | ||||
Cost of Radon Canisters | (Provide a detailed description of the number and cost for each device. Include a separate price for testing cost.) | What Type of Radon Device(s) Basement ___________ First ___________ | # of Radon Devices for Each Floor Basement ___________ First ___________ | Cost per Floor | Cost for Testing |
Cost of Asbestos Test | (Provide a detailed description of the number and cost for each device. Include a separate price for testing cost.) | What Type of Asbestos Device(s) Basement ___________ First ___________ | # of Asbestos Devices for Each Floor Basement ___________ First ___________ | Cost per Floor | Cost for Testing |
Cost of Mold Survey Test | (Provide a detailed description of the number and cost for each device. Include a separate price for testing cost.) | What Type of Mold Test(s) Basement ___________ First ___________ | # of Mold Test for Each Floor Basement ___________ First ___________ | Cost per Floor | Cost for Testing |
Cost of Lead Paint Test | (Provide a detailed description of the number and cost for each device. Include a separate price for testing cost.) | What Type of Lead Paint Test(s) Basement ___________ First ___________ | # of Lead Paint Test for Each Floor Basement ___________ First ___________ | Cost per Floor | Cost for Testing |
Summary of Lead Paint Test | Description of how you test for Lead Paint? | Procedures Followed 1 2 3 4 5 6 7 | |||
Cost for Work – Labor to conduct the test | How much will you charge to conduct the investigation? | Description of labor cost | Cost for labor to conduct the investigation | ||
Total Cost for your work | Add Up ALL Cost | Cost of Project | |||
Project Deliverables | What will you provide to the client at the end of the project? | Summarize (from above) what work will provide 1 2 3 4 5 6 7 | |||
Project Timetable | Include estimates of when each part of the project will be completed. | Estimate how long it will take to complete work from beginning to end |
Summary of Completed Contract
Using the information above, summarize contracts contents into a written summary of what your work will involve – providing specifics about: discovery, types and number of devices used, lead paint test and procedures, estimates of cost, types of labor, project deliverables, timeframe to conduct investigation, and recommendations for mitigation. Your completed contract must be at least three pages in length. At the end of your contract, include an APA-Style references page. You must use at least three academic sources. Adhere to APA Style when creating citations and references for this assignment. APA formatting, however, is not necessary.
(What will you provide to the client at the end of the project?)